翻訳と辞書
Words near each other
・ Londonderry Township, Pennsylvania
・ Londonderry Victoria Road railway station
・ Londonderry, Edmonton
・ London Underground L Stock
・ London Underground Ltd v Edwards (No 2)
・ London Underground M and N Stock
・ London Underground mosquito
・ London Underground O and P Stock
・ London Underground Q Stock
・ London Underground Q38 Stock
・ London Underground R Stock
・ London Underground rolling stock
・ London Underground rolling stock numbering and classification
・ London Underground S Stock (ex-Metropolitan Railway)
・ London Underground S7 and S8 Stock
London Underground sleet locomotives
・ London Underground Standard Stock
・ London Underground stations that are listed buildings
・ London Underground strikes
・ London Underground T Stock
・ London Underground ticketing
・ London Underground tube-gauge steam locomotives
・ London Underground Watford Joint Stock
・ London Undersound
・ London United
・ London United Busways
・ London United Tramways
・ London Universities and Colleges Athletics
・ London Universities Mooting Shield
・ London University (UK Parliament constituency)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

London Underground sleet locomotives : ウィキペディア英語版
London Underground sleet locomotives

Sleet locomotives were redundant London Underground cars converted to help with the removal of ice that built up on the conductor rails. The main batch of eighteen tube-gauge locomotives were built between 1938 and 1941 from motor cars originally built in 1903. They were refurbished in the 1960s using equipment removed from redundant T-stock vehicles, and were joined by a pair of surface-gauge locomotives in 1961. In addition to de-icing duties, some of them were also used for experiments in clearing leaves from the running rails. They had all ceased to operate by 1985. One of the tube-gauge locomotives subsequently went to the London Transport Museum, and the surface-gauge cars went to the Spa Valley Railway.
==ESL100 - ESL117==
Following the start of the 1935/40 Programme, which included large scale stock replacement, a number of motor cars from the Central London Railway became available, and forty cars, all built in 1903/4, were set aside for conversion into sleet locomotives. Each was built from a pair of motor cars; the front sections were cut off, to the rear of the front bogie, and were joined back to back to a new central section. The process began in 1938, and the first locomotive was ready for trial running on 22 December. It was long, carried a single de-icing bogie under the centre of the car, and was numbered ESL100. There were teething problems with the design, as it was too short to bridge some of the gaps in the conductor rails, and so subsequent conversions were long and included two de-icing bogies. By 1941, 18 locomotives had been built, and this number was deemed to be adequate.
The de-icing bogies carried ice-cutters, which were held against the current rail by a compressed air cylinder. Each had a rotating head with ridged steel rollers, to break up the ice. Sleet brushes with metal prongs were mounted either side of the cutter, so that the rail was swept before and after cutting, whichever way the locomotive was moving. Anti-freeze was applied to the rail by spray nozzles, supplied from a tank mounted in the central section, and accessible through a sliding door. Two operators were required, one to drive and the other to operate valves, so that when the current rail changed sides, the application of anti-freeze followed. In 1955, the process was upgraded, and the detection of the current rail was made automatic. When there was no rail, the sprays shut down, as they also did when the locomotive stopped.
As built, the sleet locomotives were fitted with GE66 motors, which were prone to flash over. This was a particular problem when the motors were switched from series to parallel mode, and in order to mitigate this, the controllers were arranged so that the motors were permanently wired in series, and could not be switched to parallel mode. This limited the maximum speed, but they needed to run fairly slowly to ensure that the anti-freeze was adequately applied, and the fact that they did not need to stop at stations meant that they could be run between service trains on most lines without disrupting the timetable. In 1962, London Transport started to scrap the T stock cars from the Metropolitan line, and electro-pneumatic motor controllers were removed from them to be fitted into the sleet locomotives. At the same time, the galvanised iron pipes which delivered the anti-freeze to the nozzles were replaced by plastic piping, which did not corrode and cause blockages, as the iron piping did. The traction motors could not be upgraded, however, due to the limited clearances in the bogies.〔
Locomotive ESL103 was scrapped in 1954 as the result of collision damage sustained in 1948. It was deemed to be beyond economical repair. Gradually, de-icing gear was fitted to service trains, beginning with the A stock on the Metropolitan line, and the need for separate sleet locomotives decreased. ESL100 and ESL112 were modified in 1972, so that they could be used to remove leaves from the running rails. Experiments were made to find a suitable fluid which would assist adhesion, but none was found. The two locomotives continued to be used for brushing leaves from the rails. All of the vehicles had ceased to be used by August 1985. ESL107 was the last to be withdrawn, and was preserved by the London Transport Museum.
''Cars marked
* were built by Metropolitan Amalgamated, all other built by Birmingham Carriage & Wagon''